Activity
From 03/29/2020 to 04/27/2020
04/27/2020
- 08:51 PM Analyzing #395: Beam energy
parameters used for the reconstruction:
ToF time constant: 68.475 ns
ToF distance: 12320 mm
thickness of th...- 07:56 PM Developing #437: Missing mass of 9Li from 3He registered in coincidence with 8He
For the analysis, the parameters from the issue 458 were used.
Identification
Realization of the identification...
- 04:39 PM Analyzing #458: Fixation of parameters related to experimental setup
The initial parameters:
number
parameter
value
unit
1
beam energy
beam...
04/22/2020
- 12:40 AM Analyzing #459 (Открыта): Beam of 10Be
Analysis related to diagnostics of the 10Be beam will be arranged as subtasks of this issue.
- 12:05 AM Analyzing #458 (Открыта): Fixation of parameters related to experimental setup
Provide essential parameters related to experimental setup basing on results obtained in task 397 (and its subtasks)....
04/21/2020
- 10:33 PM Analyzing #414: Offsets of the 3He telescope
Offset of the detectors system along X axis, mm
9Li g.s. position
1 Tel [MeV]
9Li g.s. posit...- 08:38 PM Developing #416: BeamDet thickness
Vary the BeamDet thickness within a reasonable range and report the effect on position of the peak corresponding to p...
- 07:53 PM Analyzing #400: Z-position of the side telescopes
thin telescopes Z position, mm
9Li g.s. position
1 Tel [MeV]
9Li g.s. position
2 Tel [Me...- 06:03 PM Analyzing #397: Variation of the parameters
Summed spectrum from all 4 telescopes for thin target
Green lines - coincidence with 9Li
The position of th...
Also available in: Atom