Activity

From 04/03/2020 to 05/02/2020

04/07/2020

07:59 AM Analyzing #452: Beam projection

Under the condition that at least one wire was fired in each MWPC plane, we observed time distribution for individual...

Vratislav Chudoba

04/05/2020

12:33 AM Analyzing #454: ID plot for F6 detector

To construct an identification plot from the F6 detector, a non-calibrated amplitude in ADC channels from only one PM...

Vratislav Chudoba

04/04/2020

01:43 AM Analyzing #452: Beam projection

Target plane

We worked with the 8He beam particles only (selected by ToF system). We assumed the numbering of MWPC...

Vratislav Chudoba
12:02 AM Analyzing #457: Attempt for relative calibration of side telescope

We checked if the double dE-E line on ID plot reported in task 453 was not caused by issues related to calibration. W...

Vratislav Chudoba
 

Also available in: Atom