Activity

From 03/04/2020 to 04/02/2020

04/02/2020

04:36 PM Analyzing #453: ID plot for side telescope

The first layer of side telescope was calibrated using parameters provided in task 445. The second layer was not cali...

Vratislav Chudoba
10:54 AM Analyzing #455: Estimation of the beam integral

For the beam integral calculation following selections were used:

8He selection by dE-ToF
center of the targe...

Ivan Muzalevsky

03/31/2020

02:44 AM Analyzing #457 (Открыта): Attempt for relative calibration of side telescope

Side silicon telescope intended for registration of 3He was not fully calibrated before the beginning of the beam ses...

Vratislav Chudoba
02:40 AM Analyzing #456 (Открыта): Neutron detector data

Provide current data from the neutron detector.

In separate comments

describe the calibration of the detecto...

Vratislav Chudoba
02:35 AM Analyzing #455 (Открыта): Estimation of the beam integral

Estimate the 8He beam integral for a particular beamtime period.

Try to estimate the 8He  beam integral under a re...

Vratislav Chudoba
02:30 AM Analyzing #454 (Открыта): ID plot for F6 detector

Provide the time-amplitude identification plot for a detector at F6. A group Z=1 should be separated from group Z>1. ...

Vratislav Chudoba
02:25 AM Analyzing #453 (Открыта): ID plot for side telescope

Provide a standard identification dE-E plot for side telescope.

Estimate the number of registered

3He;
6Li...

Vratislav Chudoba
02:22 AM Analyzing #452 (Открыта): Beam projection

Provide a beam projection in

MWPC1 plane
MWPC2 plane
target plane

Vratislav Chudoba
 

Also available in: Atom