Activity
From 04/02/2020 to 05/01/2020
04/07/2020
- 07:59 AM Analyzing #452: Beam projection
Under the condition that at least one wire was fired in each MWPC plane, we observed time distribution for individual...
04/06/2020
- 12:33 AM Analyzing #454: ID plot for F6 detector
To construct an identification plot from the F6 detector, a non-calibrated amplitude in ADC channels from only one PM...
04/05/2020
- 01:43 AM Analyzing #452: Beam projection
Target plane
We worked with the 8He beam particles only (selected by ToF system). We assumed the numbering of MWPC...
- 12:02 AM Analyzing #457: Attempt for relative calibration of side telescope
We checked if the double dE-E line on ID plot reported in task 453 was not caused by issues related to calibration. W...
04/02/2020
- 04:36 PM Analyzing #453: ID plot for side telescope
The first layer of side telescope was calibrated using parameters provided in task 445. The second layer was not cali...
- 10:54 AM Analyzing #455: Estimation of the beam integral
For the beam integral calculation following selections were used:
8He selection by dE-ToF
center of the targe...